Fukui

Other

Ono-Aburasaka Road

“Can You feel the Hammering Sound Reverberating in the Valleys of Echizen Ono?”~A high-standard arterial road connecting Shinano, Hida, and Echizen, with a total length of approximately 160 km~

〜Chubu-Jukan Expressway Ono-Aburasaka Road〜

Seeking to strengthen cooperation between regions and support local industries, we are proceeding with the construction of the Ono-Aburasaka Road, National Highway No. 158.

There are numerous tunnels and bridges on the Ono-Aburasaka Road. The Arashima No. 1 Tunnel (total length 2,561 m) is the first of these on which excavation has been commenced. As of the end of September 2019, 1,623 m had been completed. Excavation is progressing, and up to the present we have conducted tours of the construction site for a large number of people.

There are a lot of areas that can only be seen now!
Tours can be conducted at any time. Why not visit and take the opportunity to see something you normally can’t?

Information

Map
https://www.kkr.mlit.go.jp/kengaku/guide/qgl8vl0000006rfx-att/douro-12_1.pdf
Contact
Fukui Office of River and National Highway
2-14-7 Hanandominami, Fukui, Fukui
TEL: 0776-35-2661